Future proof
against increasing interest rates.
What’s
Included?
For the period of the Contract Plan,
If you choose to have the plan with
maintenance Trident Trailers will
fully maintain the trailer with two
full services every year. Within the
36 month contract we will supply one
full set of replacement wheels and
tyres if necessary. Any parts
showing wear will be replaced and
this includes bearings, brake
components, brake cables, electrical
and lighting systems, body fittings,
jockey wheels, winch ropes and
straps. In the case of Tipper and
Tilt Deck trailers the ram, hoses,
reservoir and manual or electric
pump are also fully covered.
All work must
be carried out at a Trident Trailers
branch.
What’s
Excluded?
Any
accidental damage to any part of the
trailer or structure will not be
covered by maintenance schedule.
Parts most likely to suffer damage
are jockey wheels, break away
cables, wheel rims, tyres, lights,
and winch straps or ropes. On tipper
and Tilt Deck trailers with electric
tip units, the battery is covered
for the first 12 months only.
Puncture
repairs will be charged and if a
tyre is sufficiently damaged to
require replacement then a charge
will be made in proportion to the
overall wear. For instance, if the
tyre is 50% worn then we would
charge half the cost of a new wheel
and tyre (we always replace a wheel
and tyre as an assembly, and never
replace a tyre on its own).
Trailer
Recovery –
Tracking System
For just £3 investment per week (and
an annual communication and
monitoring fee of £108 paid direct
to the supplier) your Trident
Trailers Contract Plan Trailer can
be fitted with a tracking device.
Trident
Trailers have worked hard at finding
a ground breaking tracking device
that works on mobile phone
technology. This unit cannot be
identified via GPS tracking systems
and is therefore hidden physically
and electronically. It has a battery
life of 4 years and requires no
recharging or outside power source.
If you already have an approved
supply of tracking devices special
quotation can be supplied.
Local Authority
-
Budgeting
Because we understand the particular
budgeting requirements of local
authorities, it is possible to
structure a Contract Plan that works
to the best advantage of the
authority in question. Please
contact us on 01622 662700 and ask
for Arthur who will gladly arrange a
visit to discuss your requirements.
End of Term
Options
Six months prior to the completion
of the Trident Trailers Contract
Plan you will be contacted to see
which of the following options you
would prefer.
a) £500
CASHBACK. So long as the trailer is
a braked trailer a cash back will be
granted. The only requirement is
that a new trailer is taken out on a
Trident Contract Plan.
b) Return the
trailer to a Trident Trailers branch
in good condition at the end of the
Trident Contract Plan Term.
c) Retain the
trailer in exchange for a Payment
equal to three monthly payments at
the end of the Trident Contract
Plan.
*Daily
equivalent – paid monthly over 36
months. Contract Plan is subject to
status and written details are
available on request. Not usually
available to private